[ Chinese wardrobe net ] wardrobe is also an indispensable piece of furniture. Nowadays, the styles of wardrobes are various. People can choose according to their own preferences, and even customize them. It is necessary to install them after buying them in the closet. Would you feel like you are in a hurry? Don't worry now, let's give you a map of the wardrobe installation steps. If you follow the steps, it will be easy to assemble. Now let's take a look.
The first step in installing the wardrobe is to install the cabinet, lay the cloth on the floor, and then pay attention to the order. The wide side panel at the end of the wall should be assembled first, and then placed on the ground after assembly. Keep a certain distance from the rear wall, about 700 mm interval, then install the three-in-one single-link, be sure to check the hole spacing and the drawing is not consistent.
The next step is to nail the cork on the solid layer, and fix it on the assembled side. The top handle has a large handle hole facing up, the remaining other solid layers are facing down, and the foot line large handle hole is facing inward. It should be noted that the height of the intermediate solid layer and the L frame are kept the same, that is, the inner space of the bottom plate to the solid layer is 960 mm.
Now it is time to install the side panels. It is also fixed with a cork. Pay attention to ensure that the cork connects the solid layers on both sides. The double connecting rod is installed on the solid layer of the second cabinet. It is also necessary to pay attention to this. The large handle on the rod can only be locked in half, and the solid layer and the side plate can be fixed simultaneously to tighten the large handle.
Place the assembled cabinet on the floor, and accurately measure the diagonal dimensions of the cabinet. Then adjust the L-frame to the same state. Note that the installation of the L-frame must first draw various parallel lines and central lines. In order to avoid errors, and finally pay attention to nails.
The installation of the three-section track is also very simple. It is similar to the three-section rail of the drawer. It should be noted that the amount of data should be taken seriously. The interval between the side plate and the center of the track is 50 mm. After measuring the data, it is necessary to accurately draw the horizontal. Cut the county, install the mother rail, and then pay attention to the adjustment and then fix; when installing the grid, pay attention to keep the gap between the side panels and 50 mm, so it is convenient to take things.
If you need to install a trousers rack, it is actually the same as the plaid. The only difference is that the gap between the trousers and the side panels needs 20 mm. This design is also convenient.
Install the wardrobe installation steps to secure the overall frame first, then install all the small parts after the wardrobe is installed, and finally check whether the connection is firm, the whole process is completed.
I saw the installation steps of the wardrobe given above. I don't think that the installation of the wardrobe is very complicated. In fact, it can be easily done in order. I hope the article will help you.
18"14.5g Dip Paint Shirt Hanger
Classic Design Powder Shirt Hanger,Excellent Workmanship Powder Shirt Hanger,Non Slip Powder Shirt Hanger,New Creative Powder Shirt Hanger
SHAOXING DINGLI METAL CLOTHESHORSE CO., LTD , https://www.dingliclothrack.com