The salt spray test chamber is also called the salt spray test chamber. Therefore, the matters that should be paid attention to during the installation and maintenance of the salt spray test machine are the matters that should be paid attention to during the installation and maintenance of the salt spray test chamber.
1. The salt spray test box can not be installed upside down and must be placed horizontally on the floor. The salt spray box operation door is easy to open, reducing the noise during mechanical operation;
2. There should be a good ventilation air around the salt spray tank, and avoid direct sunlight and near the heating part of the furnace;
3. Although the materials inside and outside the measuring and controlling box are made of high-grade PVC board, the wet water is easy to cause adverse effects on the machine and electronic control center, and the efficiency should be avoided.
4. Please use special socket for power socket. Do not use the same socket with other electrical machinery. Do not place the floor and wet place on the plug connection to avoid stepping or leakage.
5. Where the power supply voltage is too low, an autotransformer should be provided to increase the voltage to the rated value;
6. The operating door should not be opened for a long time during the test, so as not to affect the test;
7. The inside of the salt spray tank should be kept clean at any time. The outer box can be painted with a light oil when it is cleaned. It can be cleaned with a soft dry cloth. If it is too dirty, wash it with a neutral detergent and water.

AUTRENDS INTERNATIONAL LIMITED , https://www.petspetscleaning.com